Project  Resume

Skills

Project Experience

Area of Expertise

  • Environmental Manager/Team Leader

  • Project management

  • Environmental Site Assessment

  • Environmental Site Remediation

  • Environmental Reclamation

  • Environmental Pre-Site Assessment

  • Environmental Impact Assessment

  • Regulatory Liaison

  • Stakeholder Engagement

  • Environmental Training

  • Environmental Management Systems

  • Environmental Audits

  • Environmental Research

  • International Work

  • First Nations Interactions – BC, AB, and SK

 

Education

  • Graduate School, University of Calgary, 1989

  • Bachelor of Science (B.Sc.), Wildlife Science, Utah State University, 1980

  • Diploma, Environmental Science, Lethbridge College, 1974

 

 

Membership and Associations

  •  The Wildlife Society (Alberta Chapter)

 

 

Upstream and Midstream Oil and Gas

  • Grace Creek NPS 6 X 16 km high pressure natural gas pipeline in west central Alberta (Preparation of an environmental impact assessment and Environmental Monitoring).

  • Graham Chard NPS 8 X 70 km high pressure natural gas pipeline in northeastern Alberta (Preparation of an environmental impact assessment and Environmental Monitoring).

  • AECO ‘C’ NPS 6 X 10 km high pressure natural gas pipeline in southeastern (Preparation of an Environmental Protection Plan and Environmental Monitoring).

  • Ante Creek South NPS 6 X 10 km high pressure natural gas pipeline in northwestern Alberta (Preparation of an Environmental Protection Plan and Environmental Monitoring).

  • Seiu Creek South NPS 6 X 10 km high pressure natural gas pipeline in central Alberta (Preparation of an Environmental Protection Plan and Environmental Monitoring).

  • Bear River NPS 6 X 16 km high pressure natural gas pipeline in northwestern Alberta (Environmental Monitoring).

  • Edson Mainline NPS 42 X 130 km high pressure natural gas pipeline in west central Alberta. Project management for a Wildlife Distribution and Response Study during the construction of this pipeline) ($225 K).

  • Grande Prairie M/L NPS 36 X 200 high pressure natural gas pipeline.  Project management for a Wildlife Distribution and Response Study during the construction of this pipeline. ($180 K).

  • Morrin NPS 6 X 20 km high pressure natural gas pipeline in east central Alberta.(Preparation of an Environmental Protection Plan and Environmental Monitoring).

  • Preliminary environmental assessment for GasAndes NPS 24 X 463 km natural gas pipeline La Mora, Mendoza in Argentina to San Bernardo, Chile.

  • Sundance Creek NPS 6 X 10 km (Preparation of an Environmental Protection Plan and Environmental Monitoring).

  • Foothills Mainline Slope Stabilization in northwestern Alberta (Regulatory consultation for the recontouring of river banks after a slope failure).

  • Marten Hills Slope Stabilization using geotechnical groundwater drainage in west central Alberta (Environmental Monitoring).

  • Foothills Mainline (NPS 36) Simonette River Crossing rebuild (Preparation of an Environmental Impact Assessment and Environmental Monitoring).

  • Didsbury Compressor Station Unit in southern Alberta. Impacted soil remediation (Site Services).

  • Burstall Compressor Station Unit A Decommissioning and Remediation in southwestern Saskatchewan (Site Services and Report Preparation (SK) ($1 M).

  • Elmworth Compressor Station in northwestern Alberta. Due Diligence Assessment (Site Services and Report Preparation, AB) ($10 K).

  • Ten Compressor Station Waste water lagoons sediment sampling program throughout Alberta (Project Management, AB).

  • Soil assessment and remediation for petroleum hydrocarbons, mercury, and soil sterilants for over 20 high pressure natural gas meter stations throughout Alberta (Site Services and Report Preparation).

  • Phase II Environmental Site Assessment of an oil pipeline pumping station in southeastern Saskatchewan (Site Services, Carnduff and Report Preparation, SK).

  • Updating of six Phase II Environmental Site Assessments for oil well well sites in northwestern Alberta. (Data Review and Report Preparation, Whitecourt, AB) ($10 K).

  • Development of a Remedial Action Plan for the remediation of 28 well sites in northwestern Alberta. (Report Preparation, Whitecourt, AB) ($30 K).

 

MARINE TRANSPORTATION

  • Federal Environmental Impact Assessment for the rebuilding of a Large Barge Loading facility in northwestern British Columbia. Project included several First Nations consultations and underwater substrate assessment. (Project Management, Prince Rupert, BC) ($170 K).

  • Phase II Environmental Site Assessment for Shipbuilding and Repair facility prior to the purchase of the facility. Project included groundwater monitoring well installation and monitoring, sediment sampling, and tidal data collection in southwestern British Columbia. (Project Management, North Vancouver, BC) ($350 K).

  • Phase II Environmental Site Assessment for Barge Loading facility in southwestern British Columbia. Project included groundwater monitoring well installation and monitoring, sediment sampling, and tidal data collection. (Project Management, Vancouver, BC) ($350 K).

 

GROUND TRANSPORTATION

  • Phase I and II Environmental Site Assessments and Due Diligence Reports for an abandoned rail line and subsequent sale in southwestern British Columbia. (Project Management, Richmond, BC) ($50 K).

  • Phase I Environmental Site Assessment of a rail siding in southwestern British Columbia. (Project Management, Chilliwack, BC) ($5 K).

  • Phase I Environmental Site Assessment transportation storage and warehouse in southern Saskatchewan. (Project Management, Regina, SK) ($3.5 K).

  • Phase I Environmental Site Assessment transportation storage and warehouse in southern Saskatchewan. (Project Management, Yorkton, SK ($5 K).

 

RESOURCE EXTRACTION

  • Environmental Impact Assessment and Environmental Management System Development for surface coal mining projects in northeastern British Columbia. (EIA Co-developer and Project Assistance. Tumbler Ridge, BC).

 

RECREATIONAL PROPERTY

  • Development of a limited Environmental Impact Assessment for the Thompson Nicola Regional District for the development for recreational property including accommodations in north central British Columbia. (Clinton, BC) ($6 K).

 

MISCELLANEOUS PHASE I, II ENVIRONMENTAL SITE ASSESSMENTS AND REMEDIATION PROJECTS

  • Remediation of impacted soil at a former light industrial development in southwestern British Columbia. (Project Management, Vancouver, BC).

  • Remediation of impacted soil following the removal of underground storage tanks in southwestern British Columbia. (Site Services and Report Preparation, North Vancouver, BC) ($25 K).

  • Remediation of impacted soil following the removal of underground storage tank in southern Saskatchewan. (Project Management, Regina, SK) ($7 K).

  • Remediation of impacted soil following the removal of an underground storage tank in southeastern Alberta. (Site Services, Redcliffe, AB).

  • Remediation of impacted soil following the removal of an underground storage tank in northwestern Alberta. (Site Services, Cardinal Lake C/S, AB).

  • Remediation of impacted soil following previous removal of above-ground heating oil tanks (Site Services and report preparation in southwestern Saskatchewan. (Grassland National Park, SK) ($16 K).

  • Phase I Environmental Site Assessments (Site Services and Project Management, Vancouver/ Burnaby/Coquitlam/Victoria/ Pemberton, BC, Calgary AB, Regina, Swift Current and Estevan, SK) ($3.5 to $5K).

  • Phase II Environmental Site Assessment in Southern Saskatchewan. (Project Management, Regina, SK).

  • Phase II Environmental Site Assessment of former dry cleaning establishments in southwestern British Columbia using soil vapour sampling methodology. (Site Services and Project Management, Surrey and Vancouver, BC).

  • Phase II Environmental Site Assessment of former dry cleaning establishment in southern Saskatchewan using soil vapour sampling methodology. (Site Services and Project Management, Regina, SK).

  • Phase I Environmental Site Assessments of farmsteads for potash exploration in southern Saskatchewan. (Project Management, Regina area, SK) ($180 K).

  • Abandoned barrels remediation on First Nations Reserve (Project Management, Site Services, and Report Preparation. (Ft. Chipewyan, AB) ($70 K).

 

PRE-SITE ENVIRONMENTAL ASSESSMENTS

  • Potash drilling locations in southern Saskatchewan. (Project Management, Regina, SK) ($10 K).

  • Wellsite, water hub and access road in northeastern British Columbia. (Project Management, Ft. Nelson, BC) ($50 K).

 

MISCELLANEOUS FACILITY ENVIRONMENTAL AUDITS, PROTOCOL DEVELOPMENT, CHECKLIST DEVELOPMENT, AND INTEGRATED MANAGEMENT SYSTEM DEVELOPMENT

Audits

  • NOVA Corporation Empress Meter Station in Southeastern Alberta.

  • NOVA Corporation Fort MacLeod District office in Southwestern Alberta.

  • NOVA Corporation Edson District office in West Central Alberta.

  • NOVA Corporation Calgary Head office in Southern Alberta.

  • NOVA Corporation Polyethylene Facility in Northeastern Massachusetts. (Leominster, MA)

  • NOVA Corporation Corunna Ethylene Facility in Southern Ontario. (Sarnia, ON)

 

Environmental and Quality Management System Development

  • NOVA Corporation (Calgary, AB)

  • Western Canadian Coal (Tumbler Ridge, BC)

 

MISCELLANEOUS PROJECTS

  • Abandonment Cost Estimates for pipeline infrastructures

  • First Nations assessment of potential for oil pipeline spill on aquatic ecosystem and resultant First Nation reserve economy

  • Research study for vegetation regrowth along a pipeline right-of-way in a dry ecosystem in Southern Alberta. (Project Management, Brooks, AB) ($35 K)

  • Public land swap assessment in relation to wetland disturbance in Central Alberta. (Data acquisition and Report Preparation, Tofield, AB)

  • Spill response regulatory requirements for refinery in Northeastern Alberta. (Report Preparation).

  • Environmental implication of an oil spill on a major river in Southern Saskatchewan. (Report preparation) ($10 K)

  • Waste management requirements for power line infrastructures in Southeastern British Columbia. (Data acquisition and Report Preparation).

  • Operations and Technical Manual reports for a U-Vin wine preparation establishment franchise in Southwestern British Columbia. (Surrey, BC) ($5 K).

  • Study of different species of seeds broadcast via helicopter on a Pipeline RoW in West Central Alberta. (Site Services, Data Analyses, Report Preparation).

  • Study of browse production and ungulate utilization on a Pipeline RoW in West Central Alberta. (Project Management, Rocky Mtn. House, AB) ($80 K).

  • Elk harassment and heart rate research in Southwestern Alberta. (Field Work, Data Analyses, Thesis Preparation) ($300 K).

  • Small and large mammal surveys and feeding habits in a desert ecosystem in Nevada. (Field work and Laboratory Work).

  • Large mammal distribution in a forested ecosystem in Northwestern Alberta (Field Work, Report Preparation).

  • Electrofishing numerous small streams in Alberta.

  • Workshop Presentations to professional staff and academia.

  • Conference Presentations.